High Dust & Window Cleaning for Construction Projects

CleanSiteUSA delivers 200+ point final cleaning before your CO and owner walk, with in-house crews who actually understand construction punch-lists and inspection standards.

When High Dust Cleaning Happens

Your Timing: Final cleaning phase, after drywall texture and paint.

The Problem Subs Create: Construction dust sits on beams, vents, and lights forever unless someone with lifts and extension tools gets it. Janitors with step stools miss 80% of it – owners notice at walk‑through.

What We Deliver: Dust‑free from floor to ceiling.

CleanSiteUSA High Dust Scope

In-house crews with lifts and tools:

  • High Dust: Ceiling beams, HVAC vents, light fixtures, ductwork.

  • Walls & Ledges: Top of walls, door headers, upper baseboards.

  • Windows: Interior/exterior glass, frames, sills (construction film removed).

  • Atriums & High Bays: Scaffolding/lifts for tall spaces.

How High Dust Cleaning Works

Access & Lift Plan

PM assesses ceiling heights and plans lift/scaffolding access.

Specialized Crew

Dust control vacs, extension poles, lifts. Dust contained to avoid re‑settling.

Top‑to‑Bottom Verification

PM inspects high areas before declaring complete.

Why High Dust Gets Ignored

National Subs: No lifts, no long poles, no construction dust experience. They “clean what they can reach” and call it done.

CleanSiteUSA:

  • Lifts, scaffolding, HEPA vacs on every job.

  • Crews trained for post‑construction high dust.

  • PM ensures no dust rain on owner walk.

High Dust Checklist

Reference:

AreaCheck
Ceiling beams[ ] Dust-free
Vents/lights[ ] Cleaned
Windows[ ] Streak-free

Ready for Ceiling‑to‑Floor Clean?

Dust on beams and vents fails inspections and looks terrible at handover. Get high dust done right so your space shines top to bottom.